The greatest pleasure for us is when, after a successful handover, the customer is satisfied with the work we have done and the equipment ordered. In this case, two of them. Read more project successful we've just closed, we're already telling you the details of how we designed, manufactured and installed load lifters in a factory hall.
The order
Our client is a foreign-owned company, which has a factory hall two load lifting devices with identical enclosed spaces for the design and manufacture of the Eco Cranes Ltd. to move both raw materials and finished products between the levels of the work area.
The on-site survey
Our staff will assess the installation site in advance survey it was recorded that both freight lifts concrete fixed on a base, for indoor use. So there will be no need to cover them with thermal insulation panels, just nets for accident prevention and protection sidewall too.
Freight lifts are a very important part of the customer needs assessment - but other lifters - also for the required load capacity and lifting height definition. This data can help to determine many other parameters, or can be a limiting factor if, for example, the required lifting capacity cannot be installed in the desired location due to its dimensions.
The products manufactured and installed by our company hydraulic freight lifts maximum load capacity 10 thousand kg, the largest lifting height up to 20 metres. For smaller devices, we install one hydraulic working cylinder to move the load, for larger lifts we install two hydraulic working cylinders. In this project, such large structures were not necessary, the task can be perfectly performed with smaller lifts.
Implementation of the load lifters
Following the design and manufacture, our company has developed two identical 500-500 kg lifting capacities, the platforms with a surface area of 1500×1500 mm our staff installed a freight lift capable of lifting up to a height of 5.5 metres with the help of a hydraulic work cylinder.
Loading and unloading at the bottom and top, also with lattice, double wing on doors will be done through.
Also at the request of the customer, the load lifters steel structure by spraying painted grey to match the colours of the plant.
A trial run was successful, so our customer has already also commissioned the new freight lifts, which will proper maintenance can help production in the factory floor for a long time to come.
In the unlikely event of an unexpected malfunction, our expert technical staff in a short time, even on weekends carry out a professional on-site repairs.
More successful project, more recent satisfied customer. That's what we like best.