Commissioning and safe operation of cranes

Commissioning and safe operation of cranes
/
/
Commissioning and safe operation of cranes

Commissioning and safe operation of cranes

Kétfőtartós Eco-Cranes híddaru ipari csarnokban, alatta dolgozókkal

All dangerous materials handling and lifting equipment must be put into service before being put into service and before being operated. A daruk are essential for the safe operation of the commissioning and ensuring continued operational readiness, it is important to know the steps of the process and the periodic inspections that need to be carried out during the operation of the crane.

Commissioning

As described in the the crane manufacturing process as already described, commissioning consists of two parts: the factory commissioning is followed by the safety commissioning.

Commissioning for occupational safety and health is subject to a preliminary safety and health inspection prior to the installation and assembly of the crane. Since this inspection is a specialised occupational safety activity, it can only be carried out by a specialist with an independent occupational safety and health certificate.

The crane may only be operated after the satisfactory results of a preliminary inspection documents issued can be started once you have.

Periodic crane inspections

Cranes, other lifting equipment only regular inspection and service can be operated alongside. The tests are the responsibility of the owner of the machinery and should be carried out mainly by professionals.

Structural and main inspections include the following revisions:

  • Structural analysis (every 1-4 months)

Inspection of the structural elements of the machinery by visual inspection, measuring instrument and idling (no load) test. The aim is to find and repair any wear, cracks, fractures or other anomalies.

The inspection may be carried out by a lifting machinery administrator.

  • Main examination (every 0.5-3 years)

In addition to the structural inspection, the main inspection should cover the correct operation of the crane, the existence of documentation, whether the main technical characteristics of the crane correspond to the data in the logbook and the safe connection between the crane and its environment.

The test is carried out by visual inspection, measuring instrument, measuring instrument, idling, working load and static tests.

The main inspection is also carried out by the lifting machinery administrator.

  • Periodic safety inspection (every 5 years or when the environment of the lifting machine changes)

A crane documentation the need for its modernisation and the suitability of its structural design, mechanical and electrical installations and safety equipment at the time of placing in service must be assessed current health and safety requirements, is appropriate for its original function and has the same environmental characteristics as those specified at the time of design and manufacture.

About the review minutes of, which must also include a declaration of the crane's suitability for operation, signed by the inspecting lifting machinery expert.
  • Shift inspection (per shift)

The operator of the lifting machine performs the operation with the crane switched off. It consists of a visual inspection, idling test and cleaning to preserve the condition of the crane.

The Eco Cranes Ltd. contracted customers we make things easier for you, as our expert staff will turn up at a pre-arranged time to carry out the mandatory periodic inspection. Repair we offer competitive prices and a wide range of spare parts.

Call me at us with confidence, we are also partners in operation!

Leave a Reply

Széchenyi 2020 – uniós pályázati tájékoztató